All major work activities for the Humanities and Social Studies Complex (HSSC), the Admission and Financial Aid (AFA) building, and campus landscaping are included below. Abbreviation key: SOG — slab on grade; SOD — slab on deck; MEP — mechanical, electrical, and plumbing; FF — finished floor; HM — hollow metal; OH — overhead; AHU — air handling unit; any reference to “pour” refers to pouring concrete; CMU — concrete masonry unit; LVT – luxury vinyl tile (resilient flooring); TPO – thermoplastic polyolefin (membrane); APC— Acoustical Panel Ceiling
HSSC: Major activity week of Sept. 10
- Basement MEP startups
- Insulation – duct/pipe continuation
- Hang drywall – 3rd floor north pavilion
- Drywall finish – north pavilion 2nd and 3rd
- Paint – 2nd floor north pavilion
- Ceiling grid – north pavilion 2nd floor
- Chilled beams – north pavilion 2nd and 3rd
- Flooring – south pavilion 3rd floor
- Lab casework install – south pavilion
- Overhead MEP – 3rd north pavilion
- Atrium bridge ceiling MEP
- Atrium bridge – plaster
- Restroom floor tile – 2nd and 3rd floor north pavilion
- Overhead MEP – 2nd and 3rd north pavilion
- Doors and hardware – south pavilion 1st and 2nd floors
- Framing/sheetrock 99% completed – south pavilion
- Tape fire curtains – south pavilion
- Lighting install – south pavilion 3rd, 1st north pavilion
- Stoops footings/pads – south pavilion x 2 (weather permitting)
- Window stool trim – south pavilion
- Interior glazing – south and north pavilion
- Waldinger Utilities – (weather permitting)
- Exterior east elevation eyebrow APC-4-atrium
- Interior APC-5-atrium (main grid)
- Turn permanent lights and power on – south pavilion
AFA: Major activity week of Sept. 10
- Wood door and hardware install on 1st floor
- Paint 1st floor/bridge railing
- Ceiling tile and grid install on 1st floor
- Blocking and stud framing on the trellis
- Install of the Swiss pearl system
- Detail copper roof/soffit and fascia/gutters
- Granite base install
- TPO roofing install on trellis
- Shade install
- General clean
- Install backsplash above millwork
- Install atrium ceiling grid
- Install light fixtures where available
- Millwork install
- Countertop and sill install
College Landscape Project: Major activity week of Sept. 10
- Install light poles AFA east, south, Noyce n/s sidewalk
- Install cove stone north 1/3 HSSC south courtyard
- Subgrade prep HSSC main plaza
- Underground rough in HSSC main plaza
- Fine grade AFA south
- Subgrade prep HSSC south courtyard
- Demo alley/grade and prep AFA
- Install slit drains HSSC main plaza
- Install catenary light pole bases HSSC main plaza
- Place alley paving AFA